Skip to main content

Parish Meetings

Parish Meeting – 27th February 2017

LITTLE LONGSTONE PARISH MEETING

Clerk: Sarah Stokes
Longstone Byre
Little Longstone
Bakewell DE45 1NN

Tel: 01629 640851  Email:stokes271@btinternet.com

Minutes of the Parish Meeting 27th February 2017 held in Little Longstone Chapel.

Present: Mrs D Gregory (Chair), Mrs J Gledhill, Mr J Longsdon, Mrs J Blair, Mrs E Adamson, Mr P Davey and Mrs S Stokes (Clerk).

01/17 Apologies for absence.

Apologies were received from Miss M Longsdon, Mrs C Burns, Mrs D Gair-Tasker, Mrs M Longsdon, Mr R Gregory, Mr K Adamson and Mr D Gledhill.

02/17 Declarations of interest relating to matters on the agenda.

Mrs D Gregory declared an interest in item 6.3 on the agenda, trough work.

03/17 To approve minutes of the last meeting 17th October 2017.

The minutes were proposed by Mrs E Adamson and seconded by Mrs D Gregory.

04/17 Financial matters.

4.1 To approve payments since the last meeting:                               cheque no.

B Cardona strimming/mowing                    £767.00                   0577
B Cardona removal of saplings                    £60.00                     0579
T W Cox strimming/mowing                       £690.00                   0578
Energise Electrical – 999 phone                 £60.00                     0580

4.2      To approve payments due to be made:

S Stokes – Clerk admin/exp.                       £324.41                   0581
Little Longstone Congregational chapel – room  £40.00       0582
M Longsdon – xmas trees                            £185.00                   0583
Dalc – subscription                                       £15.00                     0584
Friends of Little Longstone chapel – xmas trees  £90.00      0585

The payments were proposed by Mr J Longsdon and seconded by Mr P Davey.

4.3      To approve ordering of 2 new benches. The Clerk circulated a handout of a selection of benches, from a DDDC approved supplier. It was resolved to go ahead with the Cast and Timber seat (being the same as at the chapel). This was proposed by Mrs J Gledhill and seconded by Mrs J Blair. Clerk to order two benches @ £540 each plus delivery and VAT, to organise delivery. Fixing to the ground to be reviewed at the next meeting, the bench being of a heavy structure.

4.4      To approve ordering of 2 wooden barrels (planters).

The Clerk reported costs of wooden barrels looking at locally, being £39.99 for a 24” half barrel. There was much discussion over the future of the barrels and maintenance of. It was resolved for the Clerk to ask B Cardona to remove the two barrels/soil/plants and dispose of, this was proposed by Mrs J Gledhill and seconded by Mrs D Gregory. To review further barrels/planters in future. It had also been noted that one of the barrels currently causes a slight obstruction when gaining access to the defib machine.

4.5      To approve ordering of new well boards.

 The Clerk had gained a quote from a local  joiner, whom has experience of making well boards. It was proposed by Mr P Davey and seconded by Mr J Longsdon to go ahead with the new boards, being a new well board and a children’s well. The joiner to match the current design, using softwood and tongue and grooved back boards, to be primed. The new well boards being approx. £1000.  Clerk to arrange with joiner.

4.6      Donations for financial year 2016/2017.

The Clerk reported on donations/S137 funds already made so far in this current financial year. Letters had been received from St Giles church and the Village hall management committee. It was resolved for no further donations to be made this current financial year.

To note Clerk to start preparations for audit/accounts, for approval at the May/June Annual Parish Meeting.

Internal audit to be carried out by T De Wynter.

05/17 Planning matters.

Planning application. The Lodge Chestnut House Lodge, Main Street. NP/DDD/1016/1039. Rear one and a half storey extension, store and entrance canopy to The Lodge. PM comments sent in: no objections.

Planning decision notice. The Lodge Chestnut House Lodge, Main Street. NP/DDD/1016/1039. As above.GRANTED.

Planning decision notice. Dean Cottage, Bottomhill Rd, Monsal Dale. NP/DDD/1016/0979. Erect detached greenhouse. GRANTED.

The Planning inspectorate. Order decision. Brushfield Lane. ‘The order as made would add to the Definitive map and statement for the area a bridleway (a – c on the order plan) and a footpath ( c – d) along a route presently known as Brushfield Lane’. The Clerk circulated a map showing the changes. It was noted that motorbikes are still using the lane. To monitor and view new signage for details.

06/17 Matters arising.

06.1 Monsal Head.

6.1.1The Ice cream van. The licence will come to an end at the end of December 2017. It was resolved for the Clerk to work with the Solicitor to ensure the tender document is uptodate for the next meeting. Funds of up to £200 proposed by Mr J Longsdon and seconded by Mrs E Adamson, for the above Solicitor work. Clerk to draft an advert (Peak Advertiser), in line with the last one used, for the next meeting, to go out in August/September. Tenders to be brought to the last meeting of the year being November.

6.1.2 Maintenance. It was noted that the ice cream van/area around was all in good order. The Clerk had reported some wall repairs and parking white lines to DDDC. DDDC had carried out the wall repairs, with the new lines to be actioned before easter. The Clerk had also asked DCC to cut back the off shoots on the trees on the main road for safety reasons, this had been actioned.

6.2 Parking/speeding/lighting.

6.1.1 Speeding/DCC visit. Then Clerk had met on site with DCC to look at measures to deter speeding. DCC had proposed a number of measures; new name signs, new mph signs, signs on tarmac, removing lines in centre of road, moving name signs. Handouts were circulated to see designs/ideas set out by DCC. It was resolved to go ahead with the changes, costs to be incurred by DCC, however with no removal of lines in the centre of the road, this to be monitored.  Name signs to be in black and white. Clerk to Liaise with the landowner regarding the sign movement on the chapel/ Monsal stretch. DCC have also stated that they will look to redo any white lines needed in the village (following work by Amey – water). The schedule of work was proposed by Mr Davey and seconded by Mrs J Gledhill.

6.1.2 Led lighting. DCC have reported that Little Longstone are on the list for new LED street lights in 2017, however the project had already been delayed.

6.3 Maintenance.

6.3.1 Tree opposite kiosk. A quote had been received by a local tree surgeon to; remove rest of the ivy from the canopy, remove any major deadwood, clear telephone wire and undertake a climbing inspection @ £190. To note the ivy from the trunk had been removed. It was proposed by Mrs E Adamson to go ahead with the work and seconded by Mrs J Gledhill. Further work may be required on inspection. Clerk to ask contractor to go ahead with work.

6.3.2 Quote for trough work. Mr R Gregory had put in a quote for the trough work, being £1200 – £1500, dependent on state of troughs when work commences. It was noted that further quotes had been requested in previous years, with no responce. It was proposed to go ahead with the work by Mrs J Blair and seconded by Mr J Longsdon. Clerk to ask R Gregory to go ahead with the work.

6.3.3 Dog poo near chapel – bin. The Clerk had sought help from Cllrs Judith Twigg and Cllr Neil Horton. Cllr Horton (DDDC), had reported that bins are under review with DDCC and they are ‘considering a bin at Little Longstone’. This being for below the chapel.

6.3.4 Strimming timings. Following strimming being carried out too early last year on the left hand side of the village, it was resolved for the Chair to liaise with the Clerk to give the go ahead for the contractors to strim. This allowing for the cow parsley to be enjoyed by the parishioners. Clerk to report this to Cox/Cardona.

6.3.5 Drainage. A letter of reply had been received from Cllr J Twigg, regarding the stretch from Monsal Head towards Parva Cottage. The PM asked if there would be funds in the new financial year.  Reply ‘ no funding in the foreseeable future to make any provision for this’.

To note sapling/bushes work actioned on public footpath adjacent Longstone Byre. To note 999 phone installed and now in action; defib sign installed.

6.4 Pinfold land registration. Ongoing.

07/17 Correspondence.

  • DCC. Led street lighting update. See matters arising.
  • DCC. Faulty Defibrillators. Noted.
  • DCC. Derbyshire and Derby Minerals Local Plan –sites consultation. Noted.
  • DCC. Little Longstone footpaths and byways open to all traffic. DCC had reported that they inspected the footpaths/gates/stiles in Little Longstone. They would be putting a gate in to replace the style nearest Dale Farm (footpath 4). Clerk had reported the style on footpath 5, on the request of a member. DCC had at the time stated that this was in good working order. It was reported in the meeting that the steep style had deteriorated/wall falling away. Clerk to write to DCC again regarding the style (footpath 5).
  • DCC. Speeding Little Longstone – site meeting. See matters arising.
  • DCC. Cllr Judith Twigg. Speeding Little Longstone. See matters arising.
  • DCC. Cllr Judith Twigg. Drainage. See matters arising.
  • DDDC. Area Community Forum. Tuesday 21 February 2017, 7pm. Ashford War Memorial Institute. Noted.
  • DDDC. Cllr Neil Horton. Additional bin. See matters arising.
  • PDNPA. Consultation on publication version of the Development Management policies document, forming part 2 of the Local Plan for the PDNPA. Noted.
  • Helens Trust – Thank you. Noted.
  • Great Longstone Cricket Club – Thank you. Noted.
  • Bakewell and Eyam Community Transport – Thank you. Noted.
  • Great Longstone Pre School – Thank you. Noted.
  • UTE – Thank you. Noted.
  • Dalc – circulars 16 – 19 (including internal audit checklist). Clerk reported that there will be a change of external auditor for the new financial year.
  • Aon. Insurance Act 2015.

08/17 Late correspondence.

  • DCC. Cllr J Twigg. Brushfield map. See planning.
  • DDDC. Lines in short term car park. See matters arising.
  • DDDC. Electoral register. Clerk received revised copy.
  • RBS. Circular. Noted.

09/17 Date of the next meeting. Annual Parish Meeting in May/June, date to be confirmed.

The meeting was closed at 7.53pm.

Documents